Legal basement suites in Calgary

Secondary suites, built new or legalized. The City rules, in plain words.

City suite registry fees: $0 until Dec 31, 2026.

Design idea: a warm, bright basement suite living room with its own kitchen
Design idea

Hi. Let's check your basement.

The Lodge & Level beaver
What still costs money?

The building permit: $403.52 for a new suite, $205.92 to legalize one.

Source: calgary.ca, checked Oct 25, 2026.

What makes a suite legal

Tap a point on the drawing.

Cutaway of a Calgary bungalow with a legal basement suiteMain homeBasement suite1.95 m1234567
  1. Egress window in each bedroom

    A window that opens fully: at least 0.35 m², no side under 380 mm.

  2. Own entrance

    A safe way in and out. Windows near the exit stairs may need fire protection.

  3. Own kitchen and bathroom

    A kitchen to cook in, and a bathroom with a toilet and a tub or shower, just for the suite.

  4. Own heat and fresh air

    New suites: a second furnace, or an HRV plus other heat.

  5. Smoke-tight ceiling and doors

    12.7 mm drywall, insulation and resilient channels between the two homes. Doors between them, and to shared or furnace rooms: 45 mm solid-core and self-closing.

  6. Linked smoke and CO alarms

    Hard-wired and interconnected: one sets off every alarm in the suite and at least one in the main home.

  7. 1.95 m ceiling height

    The usual minimum, and at least 1.85 m under ducts and beams.

Source: City guidebook, June 2026.

All the requirements

Is your basement suite-ready?

Allowed in all low-density districts since Aug 4, 2026.

A guide, not a City approval.

Question 1 of 6

What kind of home is it?

Rent and payback, estimated

For landlords.

Suite size
$90,000

5.8 years

of rent to pay it back. About 8.2 after costs and empty months.

Estimate, not a promise. Source: RentFaster, Oct 25, 2026.

Rent $1,300 a month: the median asking rent of 781 two-bedroom Calgary basement listings. Basement and main-floor rents fell 8% in a year (City of Calgary). Loan interest is not included. The 30% for costs and empty months is an assumption.

Get a quote

Steps to a legal suite

  1. Visit and lot checkbrother to confirm
  2. Drawings
  3. Permits
  4. Build and City inspections
  5. Registry sticker

Legalize an existing suite

Who builds it

  • Led by our own renovator.
  • Plumbing by a licensed plumber. Trades work by licensed trades.
  • A sister company of Calgary Roofing Pro and Calgary Snow Pro.

Our promises

  • We pull every permitbrother to confirm
  • Your heating plan is in the quotebrother to confirm
  • One written price, every item listedbrother to confirm
  • You never pay ahead of the workbrother to confirm

Design ideas

Ideas for your suite, not our finished jobs.

Design idea: a bright separate stair entrance down to a basement suite
Design idea
Design idea: a compact suite kitchen with navy cabinets and a breakfast bar
Design idea
Design idea: a basement bedroom with a large egress window
Design idea

Questions

What makes a basement suite legal in Calgary?

Each bedroom needs an egress window (at least 0.35 m², no side under 380 mm). The suite needs its own entrance, kitchen, bathroom, heat and fresh air, 12.7 mm drywall between the homes, linked smoke and CO alarms, and about 1.95 m of ceiling height. Then it passes City inspections and goes on the Suite Registry.

How much does a legal basement suite cost?

It depends on your basement. Published Calgary prices for a new legal suite mostly run $60,000 to $120,000 (17 Calgary price pages, read Oct 2026). Legalizing an existing suite often costs far less. Those are other companies' prices, not ours. We quote in writing after a visit.brother to confirm

Does a suite need its own furnace?

A new suite needs its own heating and ventilation: a second furnace, or an HRV plus another heat source such as baseboards. Some suites built before March 12, 2018 may share one system.

Does a suite need parking?

Suites need at least one parking stall. Some districts need less, for example near transit. The rules depend on your lot.

How long does it take?

Where a development permit is needed, the City says planning approval takes about 10 to 12 weeks, and that this is not a guarantee. Build time depends on your basement. The start and finish dates go in your contract.

Can I put a kitchen in my basement?

Yes, but a basement with its own kitchen and bathroom counts as a secondary suite. It needs a suite permit and has to meet the suite rules.

Get a quote

Name and phone, that's all.

Project (optional)

We only use your details to call you back. Privacy

More living space? Basement development